Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13696545
- Product Categories
- Friendly Links
Information Name: | Bucket elevator specifications, Shandong bucket elevator, Oswald Chen Machinery |
Published: | 2015-04-28 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Installation requirements bucket elevator bucket elevator must be securely mounted on a solid concrete foundation. Surface concrete foundation should be flat bucket elevator and horizontal state to ensure bucket elevator after installation to achieve vertical requirements. High height bucket elevator in place where the Ministry of housing and upper housing should its adjacent buildings (such as silos, workshops, etc.) are linked together to increase its stability. Install when you install the lower part, the anchor bolt, then install the central cabinet, after Ann upper housing. Cabinet installation was successful high-bucket elevator, correcting verticality. Lead straight line up and down the full height measurement, the error should be less than 10mm. The vertical shaft should be parallel to its axis line should be in the same plane. Low height bucket elevator installation, you can put the upper, middle, lower case all connected to the ground plane and the more just, then hang straight overall fixed on the concrete foundation. Safety regulations 1. hoist for maintenance and managed by the designated officer, key power switch box managed by designated personnel. 2, the hoist winch must limiter and stroke limiter, the limiter should be raised to a pulley or pulley 300mm from the reel before can automatically stop. 3, there should be the maximum load hoist flag at upgrading landing weight must not overload (1T). 4, power transmission, check winch limiter, stroke limiter, interlock switches and other safety devices, sensitive and reliable, and try hanging. 5, lifting, before landing standard bucket elevator, bucket elevator after-ringing warning machine supplier, before driving. 6, hoist absolutely impermissible manned, under. 7, after work, hoist hanging plate should fall, then cut off the power, shut the door and down the fence. 8, keep lifting machine environment surrounding health. Bucket elevator specifications, Shandong bucket elevator, Oswald Chen Xinxiang machinery supplied by Oswald Chen Machinery Co., Ltd. Oswald Xinxiang Chen Machinery Co., Ltd. (www.oweicjx.com) strong, credible, in Xinxiang of transportation equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Oswald Chen mechanical and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 19681 visitor
Copyright © GuangDong ICP No. 10089450, Oswald Chen Xinxiang Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19681 visitor
Copyright © GuangDong ICP No. 10089450, Oswald Chen Xinxiang Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility