Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13696545
- Product Categories
- Friendly Links
Information Name: | Supply belt conveyor, conveyor Jincheng, Oswald Chen Machinery |
Published: | 2015-06-12 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Conveyor belt conveyor in order to ensure the final identify Jincheng always running conveyor quotes, install roller, roller frame and the drum and the drum in the center line, you must meet the following requirements: 1) All rollers must line up parallel to each other and maintain the horizontal level. 2) All the cylinders are arranged in rows parallel to each other. 3) The supporting structure must stand straight, but also to maintain the horizontal level. To this end, the drive roller and roller frame after installation, should the centerline and the horizontal conveyor for final alignment. 5. Then the rack fixed to the foundation or slab. Belt conveyor fixed later, it can be installed for loading and unloading devices. 6. When the hanged offer Jincheng conveyor conveyor conveyor belt hanged, the first conveyor belt strips laid on the roller conveyor load segment of Jincheng offer, Wai hold the drive roller, and then wrap it in heavy the roller carrier segment. Hangings strips can be used 0.5-1.5t a hand winch. When the tension strip to connect, tension device should be moved to the extreme position of the drum, on the trolley and screw-type tensioning device would like to pull the transmission shift direction; and vertical picking drum holding device is moved to make the top . In the belt tension before, you should install the motor reducer and belt conveyors offer Jincheng inclined conveyor confidential installed brake. Run Operation 1. Close the main power switch, check the device power is being fed properly and the power indicator light. The next step is normal. 2. Close the power switch on each loop, check whether it is normal. Under normal conditions as follows: Power indicator device does not operate, the conveyor belt running light is not on, inverter and other equipment of light, the inverter display panel shows the normal (no error code shown). 3. In accordance with the process in order to start all electrical equipment, electrical equipment on the back of a normal start (motor or other device is up to speed, the normal state) before the next start of electrical equipment. Supply belt conveyor, conveyor Jincheng, Chen Machinery by Oswald Oswald Xinxiang Chen Machinery Co., Ltd. Oswald Xinxiang Chen Machinery Co., Ltd. (www.oweicjx.com) strong, credible, in Xinxiang of transportation equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Oswald Chen mechanical and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 19681 visitor
Copyright © GuangDong ICP No. 10089450, Oswald Chen Xinxiang Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19681 visitor
Copyright © GuangDong ICP No. 10089450, Oswald Chen Xinxiang Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility